A Stochastic Production and Maintenance Planning Optimisation for Multi Parallel Machine
Hafidi Nouhayla, El Barkany Abdellah & Mahmoudi Morad
Abstract
Our manufacturing system is composed of m multiple parallel machines (m> 1) manufacturing one type of product. Indeed, the production system receives a random request during a finite time horizon of which a level of service is required. The demand is greater than the total capacity of the machine park, hence the need for outsourcing to compensate for the missing demand. In addition, we consider that the unit cost of subcontracting is variable depending on the quantity subcontracted. The main objective of this approach is to jointly optimize for each period the production rate, the subcontracting rate, the preventive maintenance rate and the working time of each machine, while minimizing the costs of production, inventory holding, backlog, outsourcing and maintenance.
Keywords
References
[1] Khatab, A., Ait-Kadi, D. and Rezg, N. (2014), “Availability optimization for stochastic degrading systems under imperfect preventive maintenance”, International Journal of Production Research, Vol.52, pp.4132-4141.
[2] Ben-Salem, A., Gharbi, A. and Hajji, A. (2015), “Environmental issue in an alternative production–maintenance control for unreliable manufacturing system subject to degradation”, International Journal Advanced Manufacturing and Technology, Vol. 398, pp.77:383.
[3] Kenne, J.P., Boukas, E.K. and Gharbi A. (2003), “Control of Production and Corrective Maintenance Rates in a Multiple-Machine”, Multiple-Product Manufacturing System, Mathematical and Computer Modelling, Vol.38, pp.351-365.
[4] Nourelfath, A. and Chatelet, E. (2012), “Integrating production, inventory and maintenance planning for a parallel system with dependent components”, Reliability Engineering and System Safety, Vol.101, pp.59–66.
[5] Kim, T. and Glock C.H. (2018), “Production planning for a two-stage production system with multiple parallel machines and variable production rates”, International Journal of Production Economics, Vol. 196, pp.284-292.
[6] Haoues, M., Dahane, M., Mouss, NK. and Rezg, N. (2013), “Integrated Optimisation of In-House Production and Outsourcing Strategy: Genetic Algorithm Based Approach”, IFAC Proceedings Volumes, Vol.46, pp.420-425.
[7] Hafidi, N., El barkany, A. and Mahmoudi, M. (2018), “Modelling and optimization of integrated planning of production and maintenance with subcontract constraint”, International Journal of Engineering Research in Africa, Vol. 40, pp.184-203.
[8] Hajej, Z., Turki, S., and Rezg, N. (2015), “Modelling and analysis for sequentially optimising production, maintenance and delivery activities taking into account product returns”, International Journal of Production Research, Vol.5, PP.4694-4719.
Hajej, Z., Dellagi, S. and Rezg, N. (2009). “An optimal production/maintenance planning under stochastic random demand, service level and failure rate”, 5th Annual IEEE Conference on Automation Science and Engineering, Bangalore, India, August 22-25, pp.292-297.